The subject of the contract is the provision of a service consisting in exercising investor supervision
In the scope of management, control as well as conducting procedures and documentation of financial acceptance of performed construction works during the implementation period, warranty and warranty of the project entitled "Reconstruction and extension of the existing system of coastal fortifications at the height of the town of Mielno" implemented in the design-build system.
1. The subject of the contract is the provision of a service consisting of exercising Investor's Supervision in the field of management, control, as well as conducting procedures and documentation of financial acceptance of construction works carried out during the implementation period, warranty and warranty of the project entitled "Reconstruction and extension of the existing system of coastal fortifications at the height of Mielno "implemented in the design-build system 2. Investor's supervision will be established to implement the project in accordance with its assumptions, in particular regarding its scope, financial and material settlements of deadlines constituting the scope of works indicated in the Construction Contract. 3. The project being the subject of Investor's Supervision will be implemented under the Operational Program Infrastructure and Environment, priority axis II, ie "Supporting investments targeted at specific types of threats while increasing disaster resilience and disasters and the development of disaster management systems. ”4. The scope of construction works covered by investor's supervision includes the execution of the following elements of hydrotechnical buildings as part of the implementation of the project entitled "Reconstruction and extension of the existing shore strengthening system at the height of the town of Mielno": 1) renovation of the shore spur complex - 36 pcs; 2) construction of a heavy type erratic band with a length of approx. 450 mb; 3) modernization of the existing shore band at km 299,420 –300,010 according to UM; 4) modernization of the existing shore band at km300,010–300,260wg UM; 5) modernization of the existing shore band at km300,260- 300,380 according to UM; 6) refulation, artificial sediment supply of at least 100,000 m3. 5. Investor's supervision should be exercised on the principles and in a manner consistent with the provisions of the Agreement and the construction law in force in Poland, i.e. in particular the Act of 07 July 1997 Construction Law (i.e.: Journal of Laws of 2019, item 186, as amended). 6. On the basis of the concluded contract, according to the model contract, Annex 3 to the ToR, the Investor's Supervision will perform its duties in close cooperation with the Employer, the Contractor of works in the design-build system and if it is It is not necessary with the author's supervision of the Functional Program. 7. The Employer reserves the performance of key parts of the contract by the Contractor, i.e. entrusting the duties of Resident Engineer and Deputy Resident Engineer only to the Contractor's own potential. 8. A detailed description of the subject of the contract is provided in Annex 9 to SSWZ ... 9. Estimated value of construction works called "Reconstruction and extension of the existing system of coastal fortifications at the height of the town of Mielno" over the implementation of which the Contractor will supervise is PLN 45 155 330.39 net, VAT 0%. 10. The planned period of implementation of construction works covered by the supervision is included in Chapter 5. the required minimum period of quality guarantee for construction works being the subject of supervision is 60 months. Investor's supervision which is the subject of the contract includes supervision during warranty inspections and over the removal of any defects and defects during the warranty period and / or warranty for construction works that are covered by the above a minimum 60-month warranty on the subject of the contract (the period may be extended) .Powers of the Ordering Party due to proper performance of the contract, pursuant to Article 471KC, for investor supervision expire after 12 months from the date of expiry of the rights under the warranty and warranty on Construction works. 11. Item description using CPV codes of the Common Procurement Vocabulary: 71540000-5 Construction management services 71541000-2 Construction project management services 71520000-9 Construction supervision services 71248000-8 Project and documentation supervision 71247000-1 Construction work supervision; 71244000-0 Cost calculation, cost monitoring ; 71311000-1Advisory services in the field of civil engineering
71317000-3Advisory services in the field of risk control and prevention.