Compartment lot 306: Scaffolding
The work includes the erection of scaffolding including conversion in several construction phases for the fundamental renovation of the existing four-storey building in prefabricated construction, including the construction of a four-storey connector building.
approx. 2,500 m2 façade scaffolding, metal scaffolding, load capacity. 3, W09, freestanding
ca. 120,000 m2Wo Fassadengerüst Verlängerungswochen
approx. 320 m roof scaffolding on façade scaffolding on eaves attic
approx. 16,000 m2Where Lease of use roof scaffold
approx. 1,100 m scaffolding widening as scaffolding extension b = 0.3 m
ca. 16,500 m2Wo Gerüstverbreiterung Verlängerungswochen b=0.3 m
ca. 1.100 m Innengeländer
approx. 16,500 m2Where use of interior railings
approx. 96 m Allowance double actuator for separating construction phases
approx. 4,800 m2Where double place, extension
approx. 625 m2 conversion per m2 / free-standing façade scaffolding
approx. 22 m stair tower, running width 0.5 m, landings all 2.0 m high
approx. 1,100 m2Where stair tower, extension
2 pcs position conversion stair tower
2 pcs material elevator according to statics (1500 Z/ZP - stage B)
approx. 100 hours Provision of use of material elevator
2 pcs scaffolding beams 3-4 m
ca. 100 StWo Gerüstträger 3-4 m Verlängerungswochen
2 pcs scaffolding girder 5 m - GT 450, steel, ang ≤ 2.00 m
ca. 100 StWo Gerüstträger 5 m Verlängerungswochen
2 pcs scaffolding girders 6 m - GT 450, steel, ang ≤ 2.00 m
ca. 100 StWo Gerüstträger 6 m Verlängerungswochen
2 pcs scaffolding beam 10 m - GT 450, steel
ca. 100 StWo Gerüstträger 10 m Verlängerungswochen
2 pcs scaffolding beam 17 m - GT 450, steel
ca. 100 StWo Gerüstträger 17 m Verlängerungswochen
2 pcs scaffolding girders 10 m - GT 450, steel aOG\/UG ≤ 1.20 m - area of existing roof
approx. 88 pcs Scaffolding girders 10 m extension weeks - area of existing roof
approx. 1,550 m3 of scaffolding as a supporting scaffolding for the stiffening of the façade scaffolding
approx. 76,000 m3Where room scaffolding as supporting scaffolding Extension weeks
Install approx. 165 m2 of storage space for additional load according to scaffolding statics
approx. 8,250 m2Where to reserve storage space for additional load according to scaffolding statics
Deliver and install 22 ballast bodies 850 kg per piece
approx. 1,100 hours Ballast body 850 kg
Deliver and install 3 ballast bodies 150 kg per piece
approx. 132 pcs Ballast body 150 kg
ca. 193 m3 Raumgerüst flächenorientiert Stadtgerüst Lastklasse 3
2 pcs scaffolding stair head, move
30 pcs permanent anchors
+++Please note that the following documents are included with the OFFER at the
The following are to be submitted:
Original calculation
Content: This is at least in accordance with the
Content according to Form 223 - Breakdown of unit prices
of ALL positions, i.e. LV position;
Abbreviation; Quantity; Unit of quantity; Time approach;
Partial costs including additions in euro per unit of measure (wages,
substances, equipment, miscellaneous); offered unit price (sum
from wages, fabrics, appliances, miscellaneous). +++
+++Further contract deadlines see tender documents+++