The municipality of Hövelhof intends to build a new fire station with 9 parking spaces and a washing hall including the associated social and office rooms. The size of the building is approx. 10,500 cbm with approx. 2,300 sqm of usable space and is to be built in two successive construction phases BA (1st BA social wing 3-storey, 2nd BA hall area). Execution period approx. 1.BA CW 07-2023-KW 26/2024, 2nd BA CW31-2024 - CW21/2025
1 pc control cabinets for heating technology
1 piece control cabinets ventilation technology