Commissioning of heating installations | Tenderlake

Commissioning of heating installations

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
15 December 2021
Closing Date:
04 January 2022
Location(s):
PL91 Warszawski stołeczny (PL Poland/POLSKA)
PL911 Miasto Warszawa (PL Poland/POLSKA)
PL925 Siedlecki (PL Poland/POLSKA)
Description:
SVA/U/4620-88/2021: Complete service in the area of compl. Army in m.: Siedlce; Warsaw, Komorowo

The subject of the order is: completion of comprehensive service on the territory of the compl. Army in the m.: Siedlce; Warsaw (Gdańska Street 6, 110 Marsa Street, Żwirki and Wigury Street 9/13, Kajakowa Street 8,

2 Radiowa Street, 4A Kozielska Street, 29Listopada Street 1), Komorowo.

Ordering Party divided the order into ten parts

Complex operation - supervision of heating management in the military complex in Siedlka

Complex operation (supervision of heating management and removal of failures in accordance with the annexed scope — Annex 9 to SWZ) in compl. Army in m. m. Siedlce:

a) The exchanger in c.o. 1 (power to c.o. 450kW, power at c.w.u. 127kW),

b) Exchanger in c.2 (power to c.o. 490kW, power at c.w.u. 180kW),

c) The interchanger in the set. no. 41 (power at c.o. 630kW, power at c.w.u. 150kW),

d) The interchanger in c.no. 74 (power at c.o. 480kW, power at c.w.u. 150kW),

e) The interchanger in c.no. 115 (power per c.o. 100kW), seasonal,

f) The interchanger in the set. 144 (power to c.o. 400kW, power at c.w.u. 240kW, power to c.t. 135kW),

g) The exchanger in c.no. 136 (power per c.o. 130kW, power at c.w.u. 20kW),

h) The interchanger in the set. no. 177 (power to c.o. 630kW, power at c.w.u. 130kW),

(i) Pre-isolated and traditional networks with a total length of about 1363 m. b.,

j) Solid fuel boiler room shooting range (25kW DEFRO boiler), seasonal,

k) Gas boiler room in garrison church (boiler Buderus type Logano G234X with capacity 60kW), seasonal.

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Complete service - supervision of heating management on the territory of the military complex in Warsaw Street 29 Listopada 1

Complete service (supervision of heating management and removal of the occurrence of failures in accordance with the attached scope — Annex 9 to SWZ) on the territory of compl. Military in Warsaw Street 29 November 1:

a) The exchanger in c.o. 1 (power at c.o. 180kW, power at c.w.u. 21kW),

b) The interchanger in the set. 5 (power to c.o. 604kW, power at c.w.u. 407kW, power to c.t. 186kW),

c) Exchanger in c.6 (power per c.o. 80kW, power at c.w.u. 9kW),

d) The interchanger in the box no. 7 (power to c.o. 295kW, power at c.w.u. 109kW),

e) The interchanger in the set. 8 (power to c.o. 307kW, power at c.w.u. 174kW, power to c.t. 760kW),

f) The exchanger in c.o. 9 (power at c.o. 231kW, power per c.t. 382kW), seasonal,

g) The exchanger in construction no. 14 (power per c.o. 441kW), seasonal,

h) The interchanger in the house no. 15 (power at c.o. 160kW, power at c.t. 190kW), seasonal,

i) The exchanger in c.23 (power at c.o. 190kW, power at c.w.u. 51kW),

j) The interchanger in c.no. 27 (power at c.o. 657kW, power at c.w.u. 140kW),

k) The interchanger in the box no. 29 (power at c.o. 45kW, power at c.w.u. 5kW),

l) The interchanger in c.no. 35 (power to c.o. 202kW, power at c.w.u. 30kW, power to c.t. 212kW),

m) heating systems made in traditional and pre-insulated technology with a total length of approx. 13 286 m.b.

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Complete service - supervision of heating management on the territory of the military complex in Warsaw Gdańska 6

Complete service (supervision of heating management and removal of the occurrence of failures in accordance with the attached scope — Annex 9 to SWZ) in the area of compl. Military in Warsaw Gdańska Street 6: Wymiennikownia in the building. no. 2 (power at c.o. 230kW, power at c.w.u. 40kW).

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Complete service - supervision of heating management on the territory of the military complex in Warsaw, 110 Marsa Street

Execution of comprehensive service (supervision of heating management and removal of the occurrence of failures in accordance with the attached scope — Annex 9 to SWZ) on the territory of the military compl. in Warsaw, 110 Marsa Street:

a) Gas boiler room in bud no. 16 (2 pcs Viessmann boilers type VITOPLEX 100 with a capacity of 500kW and 620kW and Viessmann boiler type VITOPLEX 200 with a capacity of 90kW),

b) Gas boiler room in bud no 112 (2 pcs Viessmann boilers type VITOPLEX 100 with a capacity of 780kW and 950kW and Viessmann boiler type VITOPLEX 200 with a capacity of 90kW),

c) Oil boiler room in bud no. 50 (boiler Viessmann type VITOROND 100 with a capacity of 80 kW),

d) Pre-insulated networks c.o. and c.w.u. with a length of 9786 m.b.

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Complete service - supervision of district heating management on the territory of the military complex in Komorowo

Complete operation (supervision of district heating management and removal of existing failures in accordance with the attached scope — Annex No 9 to SWZ) on the territory of military compl. in Komorowo:

a) Oil and gas boiler room in bud no. 148 (2 pcs Viessmann boilers type VITOPLEX 200 with a capacity of 1100kWi 1300kW and Viessmann VITORADIAL 300T boiler with a capacity of 335kW),

b) Networks c.o., c.w.u. and c.t. preinsulated with a total tube length of 4982 m together with connection nodes in buildings no. 2,7,8,9,10,11,18,64,166,167.

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Complete service - supervision of heating management on the territory of the military complex in Warsaw Żwirki and Wigury Street 9/13

Complete service (supervision of heating management and removal of emergency failures in accordance with the attached scope — Annex 9 to SWZ) in Warsaw, 9/13 Żwirki and Wigury Street:

a) The interchanger in construction no. 65 (power per c.o. 182kW), seasonal,

b) The interchanger in c.no. 74 (power to c.o. 90kW, power at c.w.u. 15kW, power at c.t. 140kW),

c) The interchanger in c.o. 75 (power per c.o. 820kW), seasonal,

d) Interchanger in the house no. 93 (power per c.o. 79kW), seasonal,

e) The exchanger in the set. no. 95 (power per c.o. 107kW, power at c.t. 745kW), seasonal,

f) The exchanger in c.102 (power per c.o. 81kW), seasonal,

g) The exchanger in c.no. 103 (power per c.o. 1129kW, power at c.w.u. 11kW),

h) The exchanger in c.no. 111 (power to c.o. 187kW, power at c.w.u. 20kW),

i) The exchanger in c.no. 114 (power to c.o. 1351kW, power to c.w.u. 671kW, power to c.t. 1201kW),

j) The exchanger in c.o. 511 (power to c.o. 220kW, power at c.w.u. 13kW),

k) Exchanger in the set. 518 (power to c.o. 3737kW, power to c.w.u. 440kW, power to c.t. 262kW)

l) Pre-isolated and traditional networks with a length of 12000 m.b.

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Complete service - supervision of heating management on the territory of the military complex in Warsaw, Leśna Street

Execution of comprehensive service (supervision of heating management and removal of the occurrence of failures in accordance with the attached scope — Annex 9 to SWZ) on the territory of the military compl. in Warsaw, Leśna Street:

a) Oil and gas boiler room (2 pcs of boilers Viessmann type PAROMAT SIMPLEX with a capacity of 895kW each),

b) Traditional network with a length of 2800 m.b. and gas length 572 m.b.

The place of performance of services will be closed area, therefore, the Contractor is obliged to comply with the provisions of the Act dated 05.08.2010 on the protection of classified information (Journal of Laws of 2019r, item 742) — all persons entering the military compl. in Warsaw, Leśna Street must have permission to access classified information at the min level. “PROPRIETARY”.

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Complete service - supervision of heating management on the territory of the military complex in Warsaw Kajakowa Street 8

Complex operation (supervision of the heating management and removal of the occurrence of failures in accordance with the attached scope — Annex 9 to SWZ) in the area of compl. Military in Warsaw, Kajakowa Street 8: Gas boiler room (2 pcs. Viessmann boilers type PAROMAT SIMPLEX with a capacity of 1120kW each).

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Complete service - supervision of heating management on the territory of the military complex in Warsaw, Radiowa 2 Street

Execution of comprehensive service (supervision of heating management and removal of the occurrence of failures in accordance with the attached scope — Annex 9 to SWZ) on the territory of the military compl. in Warsaw, 2 Radiowa Street:

a) The interchanger in the building. no. 4 (power at c.o. and c.w.u. 723kW),

b) The exchanger in c.86 (power at c.o. and c.w.u. 937kW),

c) Exchanger in the house no. 92 (power per c.o. 358kW), seasonal,

d) The exchanger in c.no. 95 (power at c.o. and c.w.u. 1502kW),

e) Mixing nodes in buildings powered from the exchanger - 17pcs,

f) Gas boiler house no. 94 (boiler Buderus type Logano GE434 with a capacity of 325kW),

g) Join c.o. traditional with a length of 130m.b..

The place of performance of services will be closed area, therefore, the Contractor is obliged to comply with the provisions of the Act dated 05.08.2010 on the protection of classified information (Journal of Laws of 2019r, item 742) — all persons entering the military compl. in Warsaw, Radiowa Street 2 must have permission to access classified information at the min level. “PROPRIETARY”.

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Complete service - supervision of heating management on the territory of the military complex in Warsaw Kozielska 4A Street

Complete maintenance (supervision of heating management and removal of emergency failures in accordance with the annexed scope — Annex 9 to SWZ) on the territory of the compl. Army in Warsaw Kozielska 4A Street:

a) Oil boiler room in the house no. 34 (2 pcs INVAR boilers type KOD with a capacity of 55kW and Viessmann type VITODENS with a capacity of 50kW), seasonal,

b) Pre-isolated networks with a length of approx. 146 m.b., seasonal.

The subject of the contract shall be executed in accordance with the draft contract constituting Annex No 4 to the SWZ, as well as the description of the object of the contract — Annex No 9 to the SWZ.

Download full details as .pdf
The Buyer:
AMW Sinevia Sp. z o.o.
CPV Code(s):
50721000 - Commissioning of heating installations