Lot 08: Wood-aluminium windows/sun protection
General
-cramped construction site conditions
-very limited storage space
-Construction project in a listed park
-dense protected tree population
Preparatory work
-Creation of a verifiable static proof for the entire performance
-Work planning and sampling
Window sills
-Approx. 22 m window sill inside, wood
-Approx. 20 m window sill inside, wood, on upper reveal as a panel
-Approx. 376 m window sill as reveal frame, circumferential, wood
-Approx. 98 m aluminum window sill outside
Wood-aluminum windows
-Window assemblies of different sizes, composed of underneath. Components or add-on parts: fixed glazing or tilt-before-sash, impact protection glass, night ventilation cassette, fall-proof fixed glazing, fall-resistant stainless steel cables, insect protection
-16 sun protection venetian blinds with flat slats, motor-driven, incl. parallel control devices
-LSG/ LSG glazing incl. edge grinding of the individual panes
-Installation of the add-on parts at different times for the installation of the wood-aluminium windows; after completion of the ETICS system
Fensterverbünde
-Total 43 pcs.
-7 window assemblies with tilt-before-turn sashes, fall protection wire ropes
-10 window assemblies with tilt-before-turn sashes, fall-resistant fixed glazing, night ventilation cassette
-6 window assemblies with tilt-before-turn sashes, fall-proof fixed glazing, baffle pane
-6 window assemblies with fixed glazing, tilt-before-turn sashes, night ventilation cassette
-10 single windows with tilt-before-turn sashes and various attachments
-1 pcs. single window, 2 pcs. with fighter, tilt-before-turn wing
-1 piece corner window angle approx. 90° with fixed glazing, tilt-before-turn sashes, baffle pane
-1 piece corner window angle approx. 165° with fixed glazing, tilt-before-turn sashes, fall-proof fixed glazing, night ventilation cassette
-1 single window with fixed glazing
+++The following documents are required at the separate request of the awarding authority.
Submit:
- Original calculation (to check prices)
Content of the original calculation: This is at least according to the content
by Form 223 - Breakdown of unit prices from ALL headings to
i.e.: LV position; Abbreviation; Quantity; Unit of quantity;
time approach; Partial costs incl. additions in euros per
unit of measure (wages, fabrics, equipment, other); Offered
Unit price (sum of wages, materials, equipment, miscellaneous)
- Product data sheets of named makes+++
+++The maintenance is carried out for a period of 4 years without
Application of a present value factor in the evaluation of bids
Taken into account. A non-submitted maintenance price leads to the
Exclusion of the offer.+++