The Franz-Stock-Realschule will open from summer 2023
accommodate an increased number of students. In order to ensure the accommodation of all classes, a temporary solution in modular container construction is required.
The container facility must be available for use after the 2023 summer holidays.
Container facility as an interim building, 1-storey, consisting of 35 individual containers for a rental period of 24 months
Dimensions of the container system:
ca. 35.00 x 15.00 x 2.60 m
Consisting of:
6 room (class) containers (24 individual conatiner)
2 pieces of sanitary containers
1 piece Abst.-Container
1 piece technology container
7 pieces of corridor containers