Creation of fire protection concept in the context of the modernization of the dentist's house (Universitätsstr.73,50931 Cologne) for the federal Dentist Association (KZBV).
Creation of fire protection concept in the context of the modernization of the dentist's house:
It is intended to modernize the administrative building of the KZBV, Universitätsstraße 73 in 50193 Cologne. The planned measures include
- a functional revitalization of the utilization structure (transfer of the kitchen from the 4th floor to the ground floor and conversion of the vacant space as offices),
- upgrading and optimizing office space,
- modernization of the meeting room as a central meeting area with a mobile partition wall system,
- Installation of air conditioning and possibly ventilation technology in the entire building, possibly dismantling of existing refrigeration technology in some areas,
- reviewing and, if necessary, modernizing the existing building services (heating, plumbing, electrical, refrigeration),
- modernization of sanitary facilities,
- approval of a uniform fire protection concept for the entire building,
- Building physical examination of the building stock as a basis for further planning (heat protection, sound insulation, room acoustics),
- optimization of basement rooms,
- renewal of the cooling equipment and storerooms in the cellar belonging to the company kitchen,
- In phases 1-4, the entire building should be planned,
- the preliminary design (performance phase 2) with the cost estimate according to DIN 276 required as a basic service is to be provided by the end of March 2020, as the technical committees of the KZBV will make further decisions in April,
- Implementation from service phase 5 on a construction phase basis, probably during operation.
The subject of the service is the creation of a fire protection concept for the entire building with the focus on the approval of internal use units with less than 400 m
A special feature of the building is the division of the neighboring building shared by a building partition. In addition, according to the current status of the preliminary design planning directly on the main stairwell on each floor meeting rooms, which would have to be converted in case of a further increase in employees in offices.
The commissioning of the planning services takes place gradually, in the first stage for the service phases 1 to 4, that is, until the preparation of the design template as a basis for the necessary committees decisions of the client. The commissioning of the further service phases takes place in dependence of these committee decisions. There is no legal claim to the commissioning of further service phases according to HOAI.