New multifunctional building with fire station
The multifunctional house has a full basement and has two floors (ground floor and upper floor). this part of the building is built in masonry with
prestressed reinforced concrete slabs.
Adjacent to the multifunctional house is the fire brigade equipment house, which is to be built in steel construction. The building envelope (walls and ceilings) of the
Fire station is to be clad with sandwich panels.
Multifunctional house and fire station have a flat pitched monopitch roof.
Between the multifunctional building and the fire brigade equipment house there is a single-storey connecting building in solid construction, with a
walkable flat roof.
Dimensions of the individual parts of the building:
Multifunctional house approx. 17m x 28m; Intermediate building approx. 5m x 12m; Fire station approx. 28m x 20m.
FLAT ROOF WATERPROOFING - New construction of multifunctional house with fire station LOT 1 - Multifunctional house connecting constructionNew multifunctional building with fire station
LOT 1 - MULTIFUNCTIONAL HOUSE CONNECTING CONSTRUCTION
approx. 65m² roof structure with walkable slab covering and polymer bitumen membrane 2-layer
FLAT ROOF WATERPROOFING - New construction of multifunctional house with fire station LOT 2 - FIRE BRIGADE HALL CanopyNew multifunctional building with fire station
LOT 2 - FIRE STATION Canopy
approx. 120m² flat roof structure on trapezoidal sheet metal shell, waterproofing material and polymer bitumen membrane 2-layer
FLAT ROOF WATERPROOFING – New construction of a multifunctional house with fire station LOS 3 - Multifunctional house for bicycle roofingNew multifunctional building with fire station
THE 3 – Multifunktionshaus Fahrradüberdachung
approx. 50m² flat roof waterproofing with green roof structure