A60/A67 Replacement new buildings in Rüsselsheimer Dreieck - New ramps incl. buildings
Replacement of three civil engineering structures as well as production of a supporting structure with connection of the adjacent ramps at the Rüsselsheimer Dreieck. The main components are:
Concrete: ca. 15.000 m³
Steel/prestressing steel: approx. 2,200 t
Bored piles: approx. 2,800 m
Spundwandverbau: ca. 7,000 m²
Asphalt/road construction: approx. 28,000 m²
Earthworks: approx. 150,000 m³
Drainage work: approx. 1,800 m, incl. pipe penetration DN 700: approx. 40 m