A 643 A643, AK Schierst.-Schierst. Bridge, route, A 643, UF L 3482, BW 7, AS Wiesbaden-Äppelallee
LV Road Constructionapprox. 12,000 m³ of earthwork including dam removal and embankment
approx. 15,000 m² of asphalt work
400 m DN 150 PVC, 600 m DN 300 PVC, 250 m DN 400 PVC drainage pipe
approx. 25 m pipe penetration DN 300 under the A 643
LV Bridge ConstructionReplacement building, Bauwerk 7
2 substructures with a clear width of 21.75 m
Total bridge area: approx. 1,000 m²
Prestressed concrete elements with in-situ concrete addition
Deep foundation with 48 bored piles diameter 120 cm, each approx. 23 m
LV EquipmentBarriers, concrete walls for highways
LV Ordnanceapprox. 12,000 m² surface sounding up to 6 m depth
approx. 86,000 m exploratory drilling 5 m to 11 m depth
LV Traffic SafetySetting up, maintaining and dismantling traffic safety for motorways (yellow marking and transport protective device)