Construction of a new comprehensive school with upper secondary school in Kolkwitz - Lot 43.3 Fence construction/ building construction
- 432 m Stabgitterzaun H: 2.030 mm
- 25 m3 Betoneinzelfundamente
- 4 double-leaf swing gates
- 420 m Wildlife protection fence - Articulated / knot grid
160/22/15
- 3 pcs swing gate wildlife protection fence double-leaf
- For waste disposal site enclosure: 10 m3 in-situ concrete
Strip foundations, 56 m formwork for
Streifenfundamente, Wertstoffüberdachung
- For the pergola: 4 m3 in-situ concrete
Point foundations, 1 pc. pergola as
sun protection