delivery times for the 2 lots left at the initiative of the candidates without exceeding the following maximum deadlines: - order products in stock: 15 working days- order products on demand: 30 working days- order on urgent demand (< 20 panels): 15 working dayslot no1: -processing time for a standard study of 20 sets maximum carried out by the technical-commercial left to the initiative of the candidates without exceeding the maximum period of 60 working days- processing time for a standard study of 20 sets maximum carried out by the technical department of the buyer left at the initiative of the candidates without exceeding the limit fixed at 30 working days- deadlines relating to the installation will be stipulated in the order form and cannot be > 1 month from the delivery of the supplies if the installation is ordered at the same time as the supplies, or notification of the order form if the installation is the subject of a specific order form.Mandatory sample delivery
supply of vertical, permanent, police, directional and temporary metal road signs- police signage- temporary and directional signage- illuminated road signs with diodes- painting - lacquering- installation and removal of signage- recovery of waste- installation and removal of a blackout on panels
supply of permanent and temporary plastic road sign equipment- beacons J1 J3 J11 J12 J13- game reflectors- beacons J14a- flexible panels J5 B21- bollards- modular track separator-k16- weighting- construction cones K5a- K5d and K5c beacons- pads- reflectors for slides- plastic waste treatment