System design panel construction: 2-speed POS SBR 80 K6, VEB WBK Erfurt Part 1 - Energetic refurbishment: wooden windows, steel window element; Break off the outer doors with frames and dispose of them (about 213 h.) Uncovering and dismantling the parapet (214 m), storey ceilings (about 2 240 m
Part 2 - General renovation: demolition + disposal canopy, main staircase (1 each) demolition + disposal concrete block steps, straight (about 5 St.) demolition + disposal concrete pavement (outside, about 28 m
System design panel construction: 2-speed POS SBR 80 K6, VEB WBK Erfurt Part 1 - Energy-efficient refurbishment: wooden windows Break off the steel window element, outer doors with frames and dispose of them (about 213 units); Uncovering + dismantling Attica (214 m), storey ceilings (about 2 240 m
Lightning conductors (about 156 m), sheet metal parts (about 228 m), roof parts (about 40 St.), Morinolfugen (about 391 m), vorh., Roof waterproofing record (about 1 200 m