The purpose of this contract is to contract technical assistance works for the drafting of waste grouping and purification projects in various regions and municipalities of the province of Granada.
Drafting of six purification projects in the regions of Baza and Huéscar (Granada). Phase 2Baza and Huéscar regions (Granada). Phase 2.ª. The scope of the work will be the definition at the construction project level of six construction projects, one for each of the mentioned municipalities. In these projects, the necessary works will be defined to execute either a group of discharges plus a treatment plant, or just an adaptation and improvement of the existing treatment plant, depending on the nucleus, providing the necessary wastewater treatment infrastructures to the nuclei of:
1) Castillejar (Castilléjar);
2) Castril (Cebas, Cortijillos and Isidoros);
3) Cortes de Baza (Cortes de Baza, Los Laneros, La Teja and Campo Cámara);
4) Cuevas del Campo (Cuevas del Campo);
5) Galera, (Galera and the Farmhouse);
6) Puebla de Don Fadrique (Almaciles).
The subsequent discharge to the receiving medium will be carried out according to the quality conditions required in the current regulations.
The six actions indicated are justified, by the geographical proximity of each one of them, with which similar purification systems will be projected grouped according to the characteristics of each municipality, with the aim of minimizing the costs of drafting the projects in the necessary external contracts (gauges, geotechnics, etc.) and facilitate both the execution of their works, as they all have similar equipment, and later the operation of the WWTP, having the same operation.
Drafting of wastewater treatment projects in the regions of Vega de Granada and Loja (Granada). Phase 2The technical assistance service contract will include the «drafting of wastewater treatment projects in the regions of La Vega de Granada and Loja (Granada). Phase 2. ». The scope of the work will be the definition at the construction project level of seven construction projects, one for each of the mentioned municipalities. In these projects, the necessary works will be defined to execute both the groups of discharges and the treatment plant, if necessary, or as in the case of Huétor Santillán, the adaptation and improvement of its WWTP, providing the necessary wastewater treatment infrastructures to the cores of:
1) Algarinejo (Fuentes de Cesna and Carrera de La Viña);
2) Chauchina (Romilla la Nueva);
3) Huétor Santillán;
4) Illora (Brácana and Stump);
5) Láchar (Peñuelas),
6) Pinos Puente (Fuensanta and Trasmula);
7) Santa Fe (Pedro Ruiz).
The subsequent discharge to the receiving medium will be carried out according to the quality conditions required in the current regulations.
The seven actions indicated are justified, due to the geographical proximity of each one of them, with which similar purification systems will be projected grouped according to the characteristics of each municipality, with the aim of minimizing the costs of drafting the projects in the necessary external contracts (gauges, geotechnics, etc.) and facilitate both the execution of their works, as they all have similar equipment, and later the operation of the WWTP, having the same operation.
Drafting of eight purification projects in the regions of Guadix and Montes Orientales (Granada). Phase 2The technical assistance service contract will include the «drafting of eight treatment projects in the regions of Guadix and Montes Orientales (Granada). Phase 2. ». The scope of the work will be the definition at the construction project level of eight construction projects, one for each of the mentioned municipalities. In these projects, the necessary works will be defined to execute either a group of discharges plus a treatment plant, or just an adaptation and improvement of the existing treatment plant, depending on the nucleus, providing the necessary wastewater treatment infrastructures in the municipalities of:
1) Aldeire;
2) Buds of Guadix;
3) La Calahorra;
4) Tithe;
5) Dollar;
6) Huéneja;
7) Torre-Cardela;
8) Moclín (Moclín, Tózar, Limones and Guamiel).
Including the study of the situation of the facilities and current discharges, the study of alternatives and the definition at the construction project level of all the works to be executed.
The subsequent discharge to the receiving medium will be carried out according to the quality conditions required in the current regulations.
The eight actions indicated are justified, due to the geographical proximity of each one of them, with which similar purification systems will be projected grouped according to the characteristics of each municipality, with the aim of minimizing the costs of drafting the projects in the necessary external contracts (gauges, geotechnics, etc.) and facilitate both the execution of their works, as they all have similar equipment, and later the operation of the WWTP, having the same operation.
Lot IV: drafting of projects for the adaptation and improvement of the WWTP of Agrón, Cacín, El Turro, Ventas de Zafarraya and Zafarraya (Granada)The WWTPs of Agrón, Cacín, El Turro, Ventas de Zafarraya and Zafarraya (Granada). The scope of the work will be the definition at the construction project level of four construction projects, one for each of the mentioned municipalities. In these projects, the works and the way to carry them out will be defined, determining the characteristics of the materials to be used and the specifications of the different work units to be carried out necessary for the adaptation and improvement of the treatment plants of:
1) Agron;
2) Cacín and El Turro (TM Cacín);
3) Zafarraya sales;
4) Zafarraya.
Including the study of the situation of the facilities and current discharges, the study of alternatives and the definition at the construction project level of all the works to be executed.
The subsequent discharge to the receiving medium will be carried out according to the quality conditions required in the current regulations.
The four indicated actions are justified, due to the geographical proximity of each of them, with which similar purification systems will be projected grouped according to the characteristics of each municipality, with the aim of minimizing costs of drafting the projects in the necessary external contracts (gauges, geotechnics, etc.) and facilitate both the execution of their works, as they all have similar equipment, and later the operation of the WWTP, having the same operation.