Description:
Winter road maintenance in the villages of the Kęty commune in the 2023/2024 season – 6 parts

The scope of the contract includes: ensuring passability, passage and limiting traffic flow disruptions caused by snowfall through:

1) snow removal of roads, bus bays, etc.

2) combating and eliminating winter slipperiness by using chemicals and/or roughening materials,

3) and performing other works and undertaking organizational and technical activities necessary for the proper performance of the subject of the contract

4) localities covered by winter road maintenance (public municipal and internal roads administered by the Kęty Commune) and the planned number of units in the season:

a) Part 1: village Bielany (14,6 km)

b) Part 2: village Bulowice (31.3 km)

c) Part 3: village of Łęki (9.2 km)

d) Part 4: village Malec (9.0 km)

e) Part 5: village Witkowice (24,2 km)

f) Part 6: sołectwo Nowa Wieś (23.0 km)

Part 1: village Bielany

1. The scope of the contract includes: ensuring passability, passage and limiting traffic disruptions caused by snowfall through:

1) snow removal of roads, bus bays, etc.

2) combating and eliminating winter slipperiness by using chemicals and/or roughening materials,

3) and performing other works and undertaking organizational and technical activities necessary for the proper performance of the subject of the contract

4) localities covered by winter road maintenance (public municipal and internal roads administered by the Kęty Commune) and the planned number of units in the season:

Part 1: village Bielany (14.6 km)

- snow removal – 125 m-g

- uszorstnianie – 90 m-g

5) the settlements adopted rates per hour of equipment operation broken down into:

(a) snow removal

b) uszorstnianie

6) in the period from 1 November to the end of the winter action, the Contractor will be entitled to a monthly remuneration of PLN 1,512.00 gross for a particular task

due to hardware and personnel readiness. In the month in which the winter action ends, this amount due will be calculated in proportion to the number of days of the campaign.

7) a detailed description of the requirements of the Contracting Authority in the scope of winter road maintenance works in the villages of the Kęty commune is specified in SST

For a detailed description of the item of the order, see Annex 2 of the SWZ.

2. The contracting authority provided for the application of the so-called reverse procedure, i.e. pursuant to Article 139(1) of the Act

3. The contracting authority does not require the submission of the evidence in question in the proceedings in question.

4. The contracting authority provides for the award of a contract consisting in the repetition of similar services referred to in Article 214(1)(7) of the Act – in accordance with the provisions of Chapter VI of the SWZ.

5.Applies to sections. II.2.7: The order must be completed on time: winter maintenance is expected to be completed when snowfall or slippery conditions occur, ready for November 1, 2023. The date of completion of readiness to provide services covered by this contract is set for April 15, 2023 – but no longer than until the date (including the day) on which the Contractor's remuneration for the performance of the contract reaches the planned value referred to in § 5 section 2 of the contract, if it occurs before 15.04.2024. - or until the date on which, after the performance of the last activity of the Contractor and payment of remuneration for this activity, it turns out that the unused amount will be insufficient to commission any action to the Contractor on the basis of the contract or on the day on which the contract is terminated in the case referred to in § 8 clause 3 point 1) of the proposed provisions of the contract

Part 2: Sołectwo Bulowice

1. The scope of the contract includes: ensuring passability, passage and limiting traffic disruptions caused by snowfall through:

1) snow removal of roads, bus bays, etc.

2) combating and eliminating winter slipperiness by using chemicals and/or roughening materials,

3) and performing other works and undertaking organizational and technical activities necessary for the proper performance of the subject of the contract

4) localities covered by winter road maintenance (public municipal and internal roads administered by the Kęty Commune) and the planned number of units in the season:

Part 2: village Bulowice (31.3 km)

- snow removal – 380 m-g

- uszorstnianie – 135 m-g

5) the settlements adopted rates per hour of equipment operation broken down into:

(a) snow removal

b) uszorstnianie

6) in the period from 1 November to the end of the winter action, the Contractor will be entitled to a monthly remuneration of PLN 1,512.00 gross for a particular task

due to hardware and personnel readiness. In the month in which the winter action ends, this amount due will be calculated in proportion to the number of days of the campaign.

7) a detailed description of the requirements of the Contracting Authority in the scope of winter road maintenance works in the villages of the Kęty commune is specified in SST

For a detailed description of the item of the order, see Annex 2 of the SWZ.

2. The contracting authority provided for the application of the so-called reverse procedure, i.e. pursuant to Article 139(1) of the Act

3. The contracting authority does not require the submission of the evidence in question in the proceedings in question.

4. The contracting authority provides for the award of a contract consisting in the repetition of similar services referred to in Article 214(1)(7) of the Act – in accordance with the provisions of Chapter VI of the SWZ.

5.Applies to sections. II.2.7: The order must be completed on time: winter maintenance is expected to be completed when snowfall or slippery conditions occur, ready for November 1, 2023. The date of completion of readiness to provide services covered by this contract is set for April 15, 2023 – but no longer than until the date (including the day) on which the Contractor's remuneration for the performance of the contract reaches the planned value referred to in § 5 section 2 of the contract, if it occurs before 15.04.2024. - or until the date on which, after the performance of the last activity of the Contractor and payment of remuneration for this activity, it turns out that the unused amount will be insufficient to commission any action to the Contractor on the basis of the contract or on the day on which the contract is terminated in the case referred to in § 8 clause 3 point 1) of the proposed provisions of the contract

Part 3: Łęka village

1. The scope of the contract includes: ensuring passability, passage and limiting traffic disruptions caused by snowfall through:

1) snow removal of roads, bus bays, etc.

2) combating and eliminating winter slipperiness by using chemicals and/or roughening materials,

3) and performing other works and undertaking organizational and technical activities necessary for the proper performance of the subject of the contract

4) localities covered by winter road maintenance (public municipal and internal roads administered by the Kęty Commune) and the planned number of units in the season:

Part 3: village of Łęki (9.2 km)

- snow removal – 95 m-g

- uszorstnianie – 65 m-g

5) the settlements adopted rates per hour of equipment operation broken down into:

(a) snow removal

b) uszorstnianie

6) in the period from 1 November to the end of the winter action, the Contractor will be entitled to a monthly remuneration of PLN 1,512.00 gross for a particular task

due to hardware and personnel readiness. In the month in which the winter action ends, this amount due will be calculated in proportion to the number of days of the campaign.

7) a detailed description of the requirements of the Contracting Authority in the scope of winter road maintenance works in the villages of the Kęty commune is specified in SST

For a detailed description of the item of the order, see Annex 2 of the SWZ.

2. The contracting authority provided for the application of the so-called reverse procedure, i.e. pursuant to Article 139(1) of the Act

3. The contracting authority does not require the submission of the evidence in question in the proceedings in question.

4. The contracting authority provides for the award of a contract consisting in the repetition of similar services referred to in Article 214(1)(7) of the Act – in accordance with the provisions of Chapter VI of the SWZ.

5.Applies to sections. II.2.7: The order must be completed on time: winter maintenance is expected to be completed when snowfall or slippery conditions occur, ready for November 1, 2023. The date of completion of readiness to provide services covered by this contract is set for April 15, 2023 – but no longer than until the date (including the day) on which the Contractor's remuneration for the performance of the contract reaches the planned value referred to in § 5 section 2 of the contract, if it occurs before 15.04.2024. - or until the date on which, after the performance of the last activity of the Contractor and payment of remuneration for this activity, it turns out that the unused amount will be insufficient to commission any action to the Contractor on the basis of the contract or on the day on which the contract is terminated in the case referred to in § 8 clause 3 point 1) of the proposed provisions of the contract

Part 4: Sołectwo Malec

1. The scope of the contract includes: ensuring passability, passage and limiting traffic disruptions caused by snowfall through:

1) snow removal of roads, bus bays, etc.

2) combating and eliminating winter slipperiness by using chemicals and/or roughening materials,

3) and performing other works and undertaking organizational and technical activities necessary for the proper performance of the subject of the contract

4) localities covered by winter road maintenance (public municipal and internal roads administered by the Kęty Commune) and the planned number of units in the season:

Part 4: village Malec (9.0 km)

- snow removal – 80 m-g

- uszorstnianie – 70 m-g

5) the settlements adopted rates per hour of equipment operation broken down into:

(a) snow removal

b) uszorstnianie

6) in the period from 1 November to the end of the winter action, the Contractor will be entitled to a monthly remuneration of PLN 1,512.00 gross for a particular task

due to hardware and personnel readiness. In the month in which the winter action ends, this amount due will be calculated in proportion to the number of days of the campaign.

7) a detailed description of the requirements of the Contracting Authority in the scope of winter road maintenance works in the villages of the Kęty commune is specified in SST

For a detailed description of the item of the order, see Annex 2 of the SWZ.

2. The contracting authority provided for the application of the so-called reverse procedure, i.e. pursuant to Article 139(1) of the Act

3. The contracting authority does not require the submission of the evidence in question in the proceedings in question.

4. The contracting authority provides for the award of a contract consisting in the repetition of similar services referred to in Article 214(1)(7) of the Act – in accordance with the provisions of Chapter VI of the SWZ.

5.Applies to sections. II.2.7: The order must be completed on time: winter maintenance is expected to be completed when snowfall or slippery conditions occur, ready for November 1, 2023. The date of completion of readiness to provide services covered by this contract is set for April 15, 2023 – but no longer than until the date (including the day) on which the Contractor's remuneration for the performance of the contract reaches the planned value referred to in § 5 section 2 of the contract, if it occurs before 15.04.2024. - or until the date on which, after the performance of the last activity of the Contractor and payment of remuneration for this activity, it turns out that the unused amount will be insufficient to commission any action to the Contractor on the basis of the contract or on the day on which the contract is terminated in the case referred to in § 8 clause 3 point 1) of the proposed provisions of the contract

Part 5: village Witkowice

1. The scope of the contract includes: ensuring passability, passage and limiting traffic disruptions caused by snowfall through:

1) snow removal of roads, bus bays, etc.

2) combating and eliminating winter slipperiness by using chemicals and/or roughening materials,

3) and performing other works and undertaking organizational and technical activities necessary for the proper performance of the subject of the contract

4) localities covered by winter road maintenance (public municipal and internal roads administered by the Kęty Commune) and the planned number of units in the season:

Part 5: village Vítkovice (24.2 km)

- snow removal – 215 m-g

- uszorstnianie – 70 m-g

5) the settlements adopted rates per hour of equipment operation broken down into:

(a) snow removal

b) uszorstnianie

6) in the period from 1 November to the end of the winter action, the Contractor will be entitled to a monthly remuneration of PLN 1,512.00 gross for a particular task

due to hardware and personnel readiness. In the month in which the winter action ends, this amount due will be calculated in proportion to the number of days of the campaign.

7) a detailed description of the requirements of the Contracting Authority in the scope of winter road maintenance works in the villages of the Kęty commune is specified in SST

For a detailed description of the item of the order, see Annex 2 of the SWZ.

2. The contracting authority provided for the application of the so-called reverse procedure, i.e. pursuant to Article 139(1) of the Act

3. The contracting authority does not require the submission of the evidence in question in the proceedings in question.

4. The contracting authority provides for the award of a contract consisting in the repetition of similar services referred to in Article 214(1)(7) of the Act – in accordance with the provisions of Chapter VI of the SWZ.

5.Applies to sections. II.2.7: The order must be completed on time: winter maintenance is expected to be completed when snowfall or slippery conditions occur, ready for November 1, 2023. The date of completion of readiness to provide services covered by this contract is set for April 15, 2023 – but no longer than until the date (including the day) on which the Contractor's remuneration for the performance of the contract reaches the planned value referred to in § 5 section 2 of the contract, if it occurs before 15.04.2024. - or until the date on which, after the performance of the last activity of the Contractor and payment of remuneration for this activity, it turns out that the unused amount will be insufficient to commission any action to the Contractor on the basis of the contract or on the day on which the contract is terminated in the case referred to in § 8 clause 3 point 1) of the proposed provisions of the contract

Part 6: sołectwo Nowa Wieś

1. The scope of the contract includes: ensuring passability, passage and limiting traffic disruptions caused by snowfall through:

1) snow removal of roads, bus bays, etc.

2) combating and eliminating winter slipperiness by using chemicals and/or roughening materials,

3) and performing other works and undertaking organizational and technical activities necessary for the proper performance of the subject of the contract

4) localities covered by winter road maintenance (public municipal and internal roads administered by the Kęty Commune) and the planned number of units in the season:

Part 6: village of Nowa Wieś (23.0 km)

- snow removal – 205 m-g

- uszorstnianie – 70 m-g

5) the settlements adopted rates per hour of equipment operation broken down into:

(a) snow removal

b) uszorstnianie

6) in the period from 1 November to the end of the winter action, the Contractor will be entitled to a monthly remuneration of PLN 1,512.00 gross for a particular task

due to hardware and personnel readiness. In the month in which the winter action ends, this amount due will be calculated in proportion to the number of days of the campaign.

7) a detailed description of the requirements of the Contracting Authority in the scope of winter road maintenance works in the villages of the Kęty commune is specified in SST

For a detailed description of the item of the order, see Annex 2 of the SWZ.

2. The contracting authority provided for the application of the so-called reverse procedure, i.e. pursuant to Article 139(1) of the Act

3. The contracting authority does not require the submission of the evidence in question in the proceedings in question.

4. The contracting authority provides for the award of a contract consisting in the repetition of similar services referred to in Article 214(1)(7) of the Act – in accordance with the provisions of Chapter VI of the SWZ.

5.Applies to sections. II.2.7: The order must be completed on time: winter maintenance is expected to be completed when snowfall or slippery conditions occur, ready for November 1, 2023. The date of completion of readiness to provide services covered by this contract is set for April 15, 2023 – but no longer than until the date (including the day) on which the Contractor's remuneration for the performance of the contract reaches the planned value referred to in § 5 section 2 of the contract, if it occurs before 15.04.2024. - or until the date on which, after the performance of the last activity of the Contractor and payment of remuneration for this activity, it turns out that the unused amount will be insufficient to commission any action to the Contractor on the basis of the contract or on the day on which the contract is terminated in the case referred to in § 8 clause 3 point 1) of the proposed provisions of the contract

Download full details as .pdf
The Buyer:
Gmina Kęty
CPV Code(s):
90620000 - Snow-clearing services
90630000 - Ice-clearing services