Road reconstruction of the third construction phase (3rd BA) of the street Ulmenstraße - Maßmannstraße including renovation of the combined sewer collectors and drinking water pipes as well as new construction of rainwater sewers in the Hanseatic and university city of Rostock
Part 1 - 3320 m² asphalt pavement
- Hold 7510 m² paving / concrete slabs
- 2980 m³ excavated soil
- 37 Straßenabläufe
- 3100 m² asphalt paving
- 380 m² large natural stone pavement
- 660 m of natural stone shelves
- 820 m Betonborde
- 2390 m² concrete slab covering/stone paving
- 850 m² natural stone paving
- 260 m³ Baumsubstrat
- various Ausstattungselemente,
- Signage and marking
Part 2 - 185 m³ Constructing a trench to a depth of 1.75,
- 225 m line DN200 backfill,
- install 205 m PE 100 DN200 pipe,
- 4 open drainage for excavations,
- 2 Rebuild underfloor hydrants