Assignment of the engineering service finalized to the drafting of the technical and economic feasibility project and of the final project (the latter optionally) of the Crostolo dam works - Geot survey control instrumentation. Strutt. and improvement of the structural and hydraulic safety of the transom (RE-E-230-M).
Assignment of the engineering service finalized to the drafting of the technical and economic feasibility project and of the final project (the latter optionally) of the Crostolo dam works - Geot survey control instrumentation. Strutt. and improvement of the structural and hydraulic safety of the transom (RE-E-230).
CUP B89H18000250002 - CIG 7874407638.