This contract covers the engineering study of the ex-vessel remote handling and maintenance of the EC UL and EC EW.
The aim is to demonstrate installation and maintenance feasibility and reach a design and description level reliable enough to be presented and acceptable at Final Design Review RD3.
The general scope of work of this contract is:
1) Engineering analysis and studies of the ex-vessel devices installation;
2) Engineering analysis and studies of the ex-vessel devices maintenance;
3) Support to design of the components (tooling and maintenance compatibility);
4) Support to design reviews (FDR EC UL and FDR ECEW) and chit resolution.