The present main contract tender includes renovation and conversion Boligkontoret Fredericia, AFD. 404 - Christiansberg.
Based on a structural master plan, department 404 Christiansberg will be renovated and rebuilt. The renovation and conversion includes 78 existing homes, spread over 13 stairwells in 3 floors and is carried out as a subsidized construction according to the danish housing association. Act on social housing, etc., LBK no. 1012 and with subsequent amendments.
Section 404 consists of 2 building sections built in 1963 (30 homes) and 1966 (48 homes). Construction sections are divided into 3 blocks:
Block 1: 18 4-room homes of 102m2
Block 2: 30 pcs. 3-room homes of 78m2
Block 3: 30 3-room homes of 86m2
The present main contract tender includes renovation and conversion Boligkontoret Fredericia, AFD. 404 - Christiansberg.
Based on a structural master plan, department 404 Christiansberg will be renovated and rebuilt. The renovation and conversion includes 78 existing homes, spread over 13 stairwells in 3 floors and is carried out as a subsidized construction according to the danish housing association. Act on social housing, etc., LBK no. 1012 and with subsequent amendments.
Section 404 consists of 2 building sections built in 1963 (30 homes) and 1966 (48 homes). Construction sections are divided into 3 blocks:
Block 1: 18 4-room homes of 102m2
Block 2: 30 pcs. 3-room homes of 78m2
Block 3: 30 3-room homes of 86m2
The project includes a renovation and conversion into accessible housing. The project includes the following main works (the list is not exhaustive):
-Open spaces, including supply lines in soil, paving, restoration
-Buried waste disposal solution
-Roof renovation, including asbestos remediation
-Facaderenovering
-Refurbishment for accessible housing, including the establishment of lifts
-New balconies
-Renovation of stairwells
-Renovation of homes, including kitchen, bathrooms, installations, etc.
-Establishment of ventilation systems
-New white goods
It can also be stated that the project must be certified for DGNB silver and the total budget for craftsman expenses, approved by the National Building Fund in Schedule A, can be stated at 87,874,952, - ex VAT.
The detailed scope of the task and services is described in more detail in the other tender documents.