Creation of an existing elevator shaft, here: concrete and masonry work.
Extension and renovation of the European school - here: creation of an elevator shaft. The tender "masonry and concrete work" includes the following services:
Flat-rate construction site equipment
General dust protection, bulkheads
- approx. 1 hour opening of the basement ceiling, underpinning, disposal,
- approx. 1 opening of the ground floor ceiling, underpinning, disposal,
- approx. 1 opening of the 1st floor ceiling, underpinning, disposal,
- approx. 1 hour opening of the double-layer basement wall, reinforced concrete, disposal,
- approx. 1 hour opening of the single-shell ground floor wall, reinforced concrete, disposal,
- approx. 28 m
- approx. 4.5 m
- approx. 7.3 m
- approx. 4.5 m
- approx. 9 m
- approx. 7.7 m
- approx. 21 m connection of the walls to existing components,
- Approx. 4 additional concrete ring anchors in the masonry.