The services include the planning and construction of the construction and process engineering parts of a biowaste fermentation plant, including commissioning and documentation.
The services include the planning and construction of the construction and process engineering parts of a biowaste fermentation plant, including commissioning and documentation. These services include the BE 1 waste treatment (interim storage bunker, gantry crane, integration of the separately assigned bioburification processing line, conveyor belts); BE 2 fermentation (2-stage in a plug-flow fermenter with downstream secondary fermenter); BE 3 biogas (2 CHP); BE 4 exhaust air; BE 5 drying; BE 6 water (collection, distribution and discharge of all the water and wastewater volumes in the system) and the BE 7 heat (heat produced in the CHP is to be collected centrally and temporarily stored if necessary) as well as electrical, control and automation technology and construction technology and infrastructure ,