The turnkey realization of a 4-speed secondary school including a school sports hall as a two-field hall is planned.
The construction project also includes the associated outdoor facilities as well as the furnishing / equipment of the school and sports hall.
In advance, an existing building was demolished (school prefabricated building) and a construction site clearing with Flächenentsiegelung and area leveling carried out.
Delivery and installation in the school building:
- External sun protection systems of different sizes with rail-guided aluminum lamellae hanging and electric motor drive (64 pieces),
- Central / HMI device,
- weather station,
- Switch actuator (16 pieces),
- Connecting cables actuator / drive for the sun protection system (400 m),
- installation cables (650 m),
- commissioning and instruction,
- With the offer is also a maintenance offer for the outdoor sunscreen.