Rehabilitation of existing tracks in the inner city area.
- Hoher Steg: replacement of 100m grooved track while maintaining traffic
- Schwammberger Straße: Replacement of a deep groove switch R=100, replacement of 800m grooved track while maintaining traffic and public transport
- Söflinger Straße: Replacement of 1000m grooved track, replacement of 3 points, conversion of two stops. Production in sections while maintaining traffic and public transport
Hoher StegRehabilitation of existing tracks in the inner city area.
- Dismantling of 100m grooved track / level crossing while maintaining traffic
- Dismantling of 100m vignole track and production of a concrete base plate
- Restoration of 200m of tracks, of which 100m are green tracks
- Adjusting the road surfaces
- Execution within a SEV in the Whitsun holidays 2023 - BaWü
Schwamberger StrasseRehabilitation of existing tracks in the inner city area.
- Dismantling of 800m grooved track / level crossing while maintaining traffic and public transport
- Dismantling of a flat groove switch
- Restoration of 800m track system and installation of a newly delivered deep groove switch
- Extension of two stops
- Execution within an SEV in the summer holidays 2023 - BaWü
Söflinger StrasseRehabilitation of existing tracks in the inner city area.
- Dismantling of 1000m grooved track in the city while maintaining traffic and public transport
- Dismantling of a track change and a switch system
- Restoration of 1000m of track system and installation of a new switch and track change
- Barrier-free expansion of two stops, complete demolition and restoration of the stops. Adjustment of road edges
- Canal construction approx. 50m, depth ~ 4.50m
- Execution in at least two sections. The first construction phase must be completed for the city festival and be passable for public transport.