Execution of electrical work at the Braunenberg Education Campus (BCB) in Aalen-Wasseralfingen
Execution of electrical work at the Braunenberg Education Campus (BCB) in Aalen-Wasseralfingen:
- 1 St. NSHV;
- 3 St. Unterverteiler;
- Approx. 17,000 m installation line (NYM-J 3x1.5 to 5x2.5);
- Approx. 450 luminaires;
- ELA with about 60 speakers;
- BMA with approx. 190 detectors;
- 3 IT distributors 800x1.200x2.000;
- Approx. 10,000 m network cable Cat. 7A