New correctional facility Passau-Königschalding
Prison Passau, new building
V-H3 Expansion 01
For a detailed description, see point II.2.4)
New correctional facility Passau-Königschalding
Prison Passau, new building
V-H3 Expansion 01
- Drywall work: Approx. 2,500 m2 of metal ceilings folding system F30, approx. 50 m2 of metal ceiling folding system F90, approx. 9,000 m2 of suspended ceilings made of plasterboard as well as various built-in and add-on parts.
- Plaster work: Approx. 83,000 m2 per adhesive bridge and interior plaster wall, approx. 13,000 m2 per adhesive bridge and interior plaster ceiling and approx. 7,000 m2 per adhesive bridge and interior plaster stairwells.
- Double floor: Approx. 400 m2 hollow floor, approx. 7 pcs ramps and approx. 5 stairs, each including preparatory measures.
- Tile work: Approx. 1,500 m2 of floor tiles sanitary areas, approx. 6,000 m2 of wall tiles of sanitary areas and approx. 1,600 m2 of wall tiles of kitchen areas.