The subject of the contract is the execution of project documentation and work aimed at the implementation of the investment consisting in the supply and installation of boilers and the installation of solar collectors in the territory of the Municipality of Ostrów Mazowiecka, which is implemented as part of the project: “Reduction of emissions air pollution in the Municipality of Ostrów Mazowiecka”.
1. The scope of the subject of the contract includes in particular:
1.1. in the range of boilers:
1) the development of design documentation (obtaining the required rules of the decision of the architectural and construction administration authority, including: notification of construction works, construction permits, if required and other required provisions of the law of decisions, permits, arrangements, notifications);
2. Supply and assembly based on the technical documentation of 11 boilers including fixtures, including:
(a) 5 units of gas boilers,
(b) 5 units of biomass boilers,
c) 1 electric boiler,
3) disassembly of the existing boiler,
4) selection of the central heating furnace according to the PFU,
5) connection of the furnace to the installation of c.o. and c.w.u.,
6) installation of the pump unit with control,
7) Free service services during the warranty period.
1.2. for the installation of solar collectors
1) the development of design documentation in accordance with the PFU;
2) supply and assembly based on the technical documentation provided by the Contracting Authority of 2 sets of solar collector installations, together with a structure adapted to the place of assembly,
3) installation of solar collectors on a slant roof using system handles;
4) installation of the solar tray;
5) installation of the protection fittings of the solar plant and water installation;
6) installation of the pump group;
7) installation of pipelines of solar and water installations;
8) installation of insulation of pipelines of solar and water installations;
9) insertion of the solar plant into the existing installation of the preparation c.w.u.;
10) connection to the upper hose of the boiler installation c.o.;
11) installation of the pressure reducer together with the pressure gauge on the installation of cold water;
12) installation of the automation system with sensors and wiring;
13) filling the plant with a solar factor;
14) carrying out technological trials and commissioning and transferring solar installations into operation;
15) provide future users with information on its correct handling of the solar installation;
16) free service services during the warranty period;
2. Detailed scope of work (Description of the Subject of the Order) is contained in Annex No 1 to SWZ - ROGRAM FUNCTIONAL AND UTILITY Installations of heating equipment and renewable energy sources for residential and public buildings — hereinafter PFU. Note: The subject of the contract does not include comprehensive design and delivery and installation of the heat pump in Ostrów Mazowiecka Municipality, which was included in the PFU.