Construction of 66 general youth housing located in 2 buildings, the projected area is 3,155 m2.
021 - The pile contractDelivery, framing and cutting of concrete piles.
170 - Forging WorksDelivery and installation of external and internal protection and bicycle shed.
190 - elevatorDelivery and mounting of elevator (functional range).
200 - floor coveringDelivery and installation of hardwood floors and mats and linoleum.
210 - paintingSurface treatments of ceilings, walls and interior woodwork.
260 - Plumbing installationsHeating, water and interior sewer systems - incl. detailed design.
262 - VentilationDecentralized ventilation of housing - incl. detailed design.
280 - electrical installationsStrong current and low current as well as networks, antenna, installations and ABDL - incl. detailed design.
030 - soil, sewer and gardenerExcavations, bottom-up, sewer work as well as gardener and exterior coatings.
040, castingConstruction of incision molded foundations, self-supporting terrain tires and elevator pit.
090, roofingHot-roof structure and roof terraces incl. coatings, fall protection systems and skylights.
100 - thin floorsThin flooring in common areas as well as engineering rooms.
110 - masonry worksRoofing of facades.
120 - carpentry worksPlaster walls, ceilings in common areas, interior doors, etc.
122 - windows / facade closureInstallation of windows and doors as well as delivery and installation of insole benches.
128, supply of windows and doorsDelivery of windows and doors. There are stricter requirements for sound reduction.