Heating construction works (BA 4):
- TM 1: remodeling MTT and bathing department,
TM 2: reconstruction of 22 patient rooms,
- TM 3: Renewal ventilation unit wet therapy.
- disassembly and reinstallation heat distribution network with about 50 tube radiators,
- Disassembly and reinstallation heat distribution network and about 230 m
- Disassembly and reconnection of an air heater.