>_Les services to be carried out are as follows:> studies and implementation of the following systems:*Video surveillance,*Telephony/Intercom,*Sound system,*Transmission networks including the laying of cables in line and in stations,*Continuities and connection of reserve and new fibers to the connection point of the main network,*access control.>diversion of cables of the multi T4, >Tests,>Documentation,>Training,>Warranty.>_Le contract execution time is: 26 months (including the preparation period, the period of the execution studies and the execution time of the works) from the date T0 fixed by the administrative order prescribing the start of the preparation period and the period of the execution studies.>_la estimated date of start of execution is envisaged on 02/01/2024
>_Les services to be carried out are as follows:> studies and implementation of the following systems:*Video surveillance,*Telephony/Intercom,*Sound system,*Transmission networks including the laying of cables in line and in stations,*Continuities and connection of reserve and new fibers to the connection point of the main network,*access control.>diversion of cables of the multi T4, >Tests,>Documentation,>Training,>Warranty.>_Le contract execution time is: 26 months (including the preparation period, the period of the execution studies and the execution time of the works) from the date T0 fixed by the administrative order prescribing the start of the preparation period and the period of the execution studies.>_la estimated date of start of execution is envisaged on 02/01/2024