Sampling and declaration (pollutant analysis according to EBV) for measure B3 Südschnellweg.
- In-situ sampling of soils and topsoils in dam areas
- Declaration analyses according to the Substitute Building Materials Ordinance (EBV)/TR Soil/TR Construction Waste or Landfill Ordinance for excavation of grown soils, backfilling and road demolition
- Coordination with the client, the waste and geotechnical construction supervision (fBÜ), specialist authorities and the public construction supervision (öBÜ) used by the client
- Possibly participation in construction meetings.
For more details, see the design description.
Sampling and declaration (pollutant analysis according to EBV) for measure B3 Südschnellweg.
- In-situ sampling of soils and topsoils in dam areas
- Declaration analyses according to the Substitute Building Materials Ordinance (EBV)/TR Soil/TR Construction Waste or Landfill Ordinance for excavation of grown soils, backfilling and road demolition
- Coordination with the client, the waste and geotechnical construction supervision (fBÜ), specialist authorities and the public construction supervision (öBÜ) used by the client
- Possibly participation in construction meetings.
The laboratory analyses must be handed over to the client no later than 14 calendar days after sampling.
It should be noted that since the beginning of the construction project, sampling has been carried out in accordance with LAGA PN98 and declaration in accordance with LAGA M20.
The declaration according to LAGA M20 will be replaced by the declaration according to EBV from 01.08.2023. For this reason, it will be re-awarded.
For more details, see the design description.