Delivery and commissioning of 4 1,250 kVA emergency power systems in a 40-foot container
The existing medium-voltage ring cable will be disconnected and routed via the new energy stations A and B to be built.
The energy centres will be erected in the immediate vicinity of the building as external, 2-part buildings in prefabricated concrete construction and will each accommodate a medium-voltage switchgear 10 kV, 2 transformers 1,250 kVA and a low-voltage main distribution NSHV-SV. In addition, 2 emergency power systems 1,250 kVA in container design are connected to an NSHV per supply path.