Building 24, Station 19 Modernization and extension building Carpenters, roofing work
- Temporary roof, easy to open, lockable cover 30 m
- Construction plans to protect against rain, provision 935 m
- Demolition of roofing 900 m
- Demolition of the roof structure in the entry area of the new 95 m elevator shaft,
- Demolition of the roof structure in some areas, new dormers 175 m,
- Support of the roof structure, resolution of trusses 36 m,
- Demolition of ceiling formwork on ceiling above ground floor, attic 800 m
- Construction timber, cutting class A, S10 for roof and ceiling constructions 32 m
- Solid structural timber KVH NSi, glulam 6 m
- Tying and erection of the roof structure 2,850 m,
- Tying and setting up, ceilings 420 m,
- OSB formwork, ceilings, 25 + 30 mm 800 m
- Over-rafter insulation made of wood wool lightweight panels 955 m
- 160 mm mineral wool thermal insulation, 955 m between rafters
- Roofing double grooved interlocking tiles 12 engobe 955 m