Construction work for swimming pool

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 November 2020
Closing Date:
03 December 2020
Location(s):
DE124 Rastatt (DE Germany/DEUTSCHLAND)
Description:
Redesign of the Bühlot outdoor pool in Bühlertal - high and low voltage systems

Renewal and modernization of the Bühlot outdoor pool in Bühlertal:

After more than 50 years of operation, the outdoor swimming pool built in the 1960s is in need of major renovation and modernization.

The following measures are planned:

- Reduction of the water surface of the existing combination pool from approx. 1,500 square meters to 960 square meters,

- Dismantling of the existing functional building and replacement with a two-part new building with accommodation of the technical systems as well as the changing, sanitary and personnel areas,

- Complete renewal of the water treatment system and the associated piping as well as renewal of the sanitary, heat supply and electrical systems,

- Installation of a stainless steel combination pool in the existing concrete pool,

- complete renovation of the outdoor facilities,

- Installation of a wide wave slide and a new jumping facility (1 m, 3 m, 5 m).

Start of construction: March 1, 2021 Completion: April 15, 2022 Total construction costs (KG 200-600): approx. 5.6 million EUR net.

High and low voltage systems:

- 1 piece main distribution,

- approx. 160 pieces of lights,

- 2 mast lights,

- Site electricity / dismantling work,

- inlay work,

- KNX building automation,

- 1 group battery system,

- approx. 4 800 m power lines,

- approx. 7,000 m of low-voltage lines.

Period:

- Site electricity / dismantling 1.3.2021,

- Inlay work from October 4th, 2021,

- Electrical installation October 4, 2021 to March 14, 2022,

- Commissioning until April 30th, 2022,

Download full details as .pdf
The Buyer:
Gemeinde Bühlertal
CPV Code(s):
45212212 - Construction work for swimming pool
45311200 - Electrical fitting work