Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 June 2016
Closing Date:
11 July 2016
Location(s):
NO071 Nordland (NO Norway/NORGE)
Description:

The project national road 77 the Tjernefjell tunnel includes tunnel works and portals, as well as some roadworks on both side of the tunnel. The length of the tunnel is 3 230 metres and shall be constructed in accordance with class B, with a cross section of T9,5.

At the Junkerdal side a cutting and 480 metres road shall be constructed as a connection to the existing national road 77.

At the Saltdal side the national road 77 will have a section in open air. The length of this section is 490 metres with a crossing connection to the E6. The E6 shall be reconstructed on an 800 metre long section on both side of this crossing A road connected to the old national road 77 shall also be constructed.

Masses shall be laid in the road embankment and the ground shall be levelled for the future E6. The masses shall also be placed in a deposit in Junkerdalen, Lønsdal and at the left tunnel portal on the Saltdal side.

Download full details as .pdf
The Buyer:
Statens vegvesen Region nord (The Norwegian Public Roads Administration, Region North)
CPV Code(s):
45000000 - Construction work
45112600 - Cut and fill
45220000 - Engineering works and construction works
45221000 - Construction work for bridges and tunnels, shafts and subways
45221241 - Road tunnel construction work