The Linth 2025 waste incineration plant project includes, among other things, the replacement of the furnace and boiler of furnace line 2, the upgrading of the furnace and boiler furnace line 1 as well as the renewal of the exhaust gas cleaning of both furnace lines. Furthermore, the delivery and interim storage will be renewed and the bunker expanded. The project consists of the main process engineering lots "New firing and boiler furnace line 2 (lot 1.1)", "Upgrading firing and boiler furnace line 1 (lot 1.2)" and "exhaust gas cleaning (lot 2)".
Lot 1.1 "Firing and boiler" includes the supply of an incineration line for municipal waste and other waste based on grate firing with a capacity of 11.25 t/h and a gross heat capacity of 40 MW. The delivery includes the combustion (air system, grate, firing capacity control and purification) as well as the boiler, the electrostatic precipitator and all necessary ancillary systems.
The Linth 2025 waste incineration plant project includes, among other things, the replacement of the furnace and boiler of furnace line 2, the upgrading of the furnace and boiler furnace line 1 as well as the renewal of the exhaust gas cleaning of both furnace lines. Furthermore, the delivery and interim storage will be renewed and the bunker expanded. The project consists of the main process engineering lots "New firing and boiler furnace line 2 (lot 1.1)", "Upgrading firing and boiler furnace line 1 (lot 1.2)" and "exhaust gas cleaning (lot 2)".
Lot 1.1 "Firing and boiler" includes the supply of an incineration line for municipal waste and other waste based on grate firing with a capacity of 11.25 t/h and a gross heat capacity of 40 MW. The delivery includes the combustion (air system, grate, firing capacity control and purification) as well as the boiler, the electrostatic precipitator and all necessary ancillary systems.