Hospital facilities construction work | Tenderlake

Hospital facilities construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
15 November 2019
Closing Date:
22 January 2020
Location(s):
DE13A Waldshut (DE Germany/DEUTSCHLAND)
Description:
Spital Waldshut interim cultivation Bettenhaus Nordbau "medical technology"

Klinikum Hochrhein GmbH plans to build additional capacity with approx. 2,840 m in order to create additional capacity 2 BGF and about 10 760 m 3 BRI to the existing hospital in Waldshut. It will be erected above the forecourt at the main entrance to the hospital as a three-storey modular building and raised on a single-storey steel structure. On one floor there is an intensive care unit with 14 beds, on the other two floors there is one general ward with 24 beds each. The technical center is housed on the roof. The interim building will be connected to the existing building via 2 three-storey connecting bridges. The services are advertised in the following trades:

- pile foundation,

- Shell,

- Steel construction,

- room module,

- medical technology.

For the equipment of an intensive care unit with 4 x 1-bed rooms and 5 x 2 bed rooms, horizontal medium supply units including the functional accessories are required to supply the intensive care bed space with medical gases, high and low current.

Download full details as .pdf
The Buyer:
Klinikum Hochrhein GmbH
CPV Code(s):
45215140 - Hospital facilities construction work