Demolition and evacuation of the coal installations of the Résonor boiler room in Lille
Demolition and evacuation of the coal installations of the Résonor boiler room in Lille:
- Site preparation,
- Protection of equipment,
- Completion of the withdrawal plan,
- Containment of facilities,
- Dismantling of coal installations, including:
• 2 coal-fired boilers of 40 MW
• 1 concrete silo
• 1 unloading area
• Coal conveyors
• The ash conveyor
• The fireplace
• 2 électrofiltres
• Miscellaneous equipment
- the treatment and disposal of waste, including asbestos,
- All necessary conditions for the successful completion of the dismantling of the coal installations on the site.