Clinic and gym construction. For this purpose, two houses will be built, which are connected by a parking garage in the 1st/2nd basement.
House M: Façade area measured approx. 1'735m2 (without windows, doors approx. 976m2). Roof area approx. 1'830m2.
House N: Façade area measured approx. 425m2 (without windows, doors approx. 270m2). Roof area approx. 647m2.
Roof: Roof construction as timber engineering with purlins, rafters, intermediate insulation, substructure for slightly inclined roofs, under-roof increased requirement (according to SIA 232), counter-battening, formwork (on-site thin sheet cover from formwork).
Façade construction: mullion / transom construction, intermediate insulation. Connections to components tight for Minergie-P certification. Substructure curtain wall. Curtain wall white fir wood pressure impregnated, factory coated with system guarantee. Due to use, the achievement of increased sound insulation requirements is assumed.
Clinic and gym construction. For this purpose, two houses will be built, which are connected by a parking garage in the 1st/2nd basement.
House M: Façade area measured approx. 1'735m2 (without windows, doors approx. 976m2). Roof area approx. 1'830m2.
House N: Façade area measured approx. 425m2 (without windows, doors approx. 270m2). Roof area approx. 647m2.
Roof: Roof construction as timber engineering with purlins, rafters, intermediate insulation, substructure for slightly inclined roofs, under-roof increased requirement (according to SIA 232), counter-battening, formwork (on-site thin sheet cover from formwork).
Façade construction: mullion / transom construction, intermediate insulation. Connections to components tight for Minergie-P certification. Substructure curtain wall. Curtain wall white fir wood pressure impregnated, factory coated with system guarantee. Due to use, the achievement of increased sound insulation requirements is assumed.