Civil engineering
Provision of construction services for surface demolition and final surface restoration.
The construction project amounts to a length of approx. 420 meters and is divided into four sections.
In each of the four sections, the asphalt surface must be removed and disposed of. The Restoration
is carried out in accordance with the attached planning documents. If necessary, the frost protection layer must be improved, and
to profile. Existing concrete edging and kerbs shall be tested for integrity and
in case of damage.
In section 1, the edging of the tree ditch, a mastic asphalt gutter along the entire length and the topsoil for planting must also be created.