Meet the electricity supply needs of the facilities of the City Council of Granada, as final consumer, and which are described in Annexes 1 (electrical supplies classified by lots) and 2 (electrical supplies classified by groups) of the Technical Specifications
Lot 1: Supplies with voltage less than 1 kV and contracted power less than 15 kW.Lot 1: Supplies with voltage less than 1 kV and contracted power less than 15 kW
Lot 2: Supplies with voltage less than 1 kV and contracted power greater than 15 kWLot 2: Supplies with voltage less than 1 kV and contracted power greater than 15 kW
Lot 3: Supplies with voltage greater than 1 kV and less than 30 kVLot 3: Supplies with voltage greater than 1 kV and less than 30 kV