Joinery and carpentry installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
21 October 2022
Closing Date:
15 November 2022
Location(s):
DE93 Lüneburg (DE Germany/DEUTSCHLAND)
Description:
KPP - Centralization of Psychiatry Clinic Pychotherapy (1st BA) - Psychiatric Clinic Lüneburg

KPP - Centralization of the Clinic for Psychiatry and Psychotherapy in Lüneburg,

Carpentry work, new construction of components A and B The Psychiatrische Klinik Lüneburg gemeinnützige GmbH is both a specialist hospital for psychiatry, psychotherapy and psychosomatics as well as a specialist clinic for child and adolescent psychiatry and psychotherapy as well as an academic teaching hospital of the University of Hamburg and the Georg-August-Universität Göttingen and plans to centralize the Clinic for Psychiatry & Psychotherapy at the Lüneburg location.

The individual measures listed below are part of this tender:

Carpentry work DIN 18355

44-hour patient closet in the standard room (2-bed), divided, incl. valuables compartments and luggage compartment;

4-hour patient cabinet recreation room day clinic patients;

8-hour patient cabinet crisis room, divided, incl. valuables compartment and luggage compartment;

96 pcs patient room wall niche as storage area / impact protection;

96 pcs magnetic wall / mural element / wall board in the patient room, see color and material concept;

8 pcs magnetic wall crisis room (for use as iso room, crisis pad: no magnets);

48 pcs patient room wardrobe, wall protection element with two hooks / patient each, above it hat rack;

48 pcs patient room seating window sill, solid core material, HPL coated, 4-5cm thickness, t=45cm, with "backrest";

8 pc crisis room seating window sill, solid core material, HPL coated, 4-5cm thickness, t=45cm;

366 m patient room seitl. Wall protection, HPL on carrier plate, flush with magnetic wall;

53 pcs shelf and towel holder patient bath;

4 pcs shelf and towel holder patient bath day clinic patients;

8 pcs coat lock wall shelf with coat hook;

34 m storage board crisis room, 20cm wall doubling with storage console, HPL surface maple look;

4-hour station kitchen, incl. stove, dishwasher, refrigerators, edging shelf tray trolley;

4 st kitchenette (pantry) staff lounge;

4 pcs buffet counter dining room, HPL coated, open and closed compartments (lockable);

4 pcs room divider element between dining room and support point, incl. compartments and bench, transparent upwards;

4 pcs of open ward counter care base incl. storage compartments, optical space closure to the traffic area ("Salo;

4 pcs rear enclosure care support point, wood cladding as acoustic element;

4 pcs built-in wall TV / lounge;

4 pcs window sill / built-in bench in the TV / lounge;

4-hour sitting area in hallway niche, HPL surface, seat and back upholstery;

22 m wooden privacy slats in front of glass walls between patient openings. and TV room;

140 m2 acoustic elements Pat. stay: wall absorber (UK with insulation insert, frame, textile covering);

5 pcs "bulletin board" station entrances and main entrance;

4 St Wandobjekt Adressbildung Stationseingänge;

16 pcs storage area in the back office: shelf / compartments, l=1.80m;

4-hour cloakroom with valuables compartments in the staff lounge;

4 pcs care combination work space clean / modular cabinets, l=4,50m,

4 St Pflegekombination Untersuchungsr. ("Time Out") / Modulschränke, l= ca. 2,00m;

4 pcs wall shelf in the station bathroom, HPL surface, resistant to moisture, wall mounted;

4 pcs storage cabinet care utensils in the station bathroom, t=approx.80cm, l=3.25, room-high, lockable;

1 hour visitor room - built-in furniture under "technical staircase", wall and door cladding;

28 pcs doors to "sub-distribution niches" in corridors, T30 OTS, HPL-coated (motif printing);

16 m built-in bench, firmly upholstered, hallway in front of doctor's rooms, 2 Stat. BT B, meeting room;

1406 m impact protection plastic, h=1m d=2mm, in corridors & adjoining rooms;

155 pcs edge protector plastic, areas with bed /freight transport;

152 m impact protection HPL surface wood look, h=ca.1m, d=ca.1cm;

536 m handrail hardwood (in corridors), diameter. approx. 42mm;

164 m handrail hardwood on stairwell railings;

1 st pedestal installation GG area foyer staircase, A1, suicide prevention;

1 pc platform installation "communication area", A1, seating step and bench at the entrance new building;

70 m window sills "normal" - HPL surface and edge;

9 m window sills basement light shafts - HPL surface and edge;

6 m window sills staircases - material non-combustible;

70 m seat window sill on concrete balustrade - solid core material, HPL coated, 4-5cm thickness, t=45cm;

88 m seat window sill on stand console in front of P-R facades, solid core material, HPL coated, 4-5cm thickness, t=45cm;

10 pcs seat window sill at corridor ends, solid core material, HPL coated, 4-5cm thickness, t=45cm;

230 m skirting boards hardwood. lacquered;

531 m ceiling reinforcement for curtain rails;

Download full details as .pdf
The Buyer:
Psychiatrische Klinik Lüneburg gemeinnützige GmbH
CPV Code(s):
45420000 - Joinery and carpentry installation work