1. The subject of the contract is the modernization of street lighting in the Municipality of Celestynów, carried out as part of an investment task co-financed on the basis of Resolution No. 84/2021 of the Council of Ministers of 1 July 2021 on the establishment of the Government Fund Polish Ład: Strategic Investment Program in the investment area: Power and lighting infrastructure
1. The subject of the contract is the modernization of street lighting in the Municipality of Celestynów, carried out as part of an investment task co-financed on the basis of Resolution No. 84/2021 of the Council of Ministers of 1 July 2021 on the establishment of the Government Fund Polish Ład: Strategic Investment Program in the investment area: Power and lighting infrastructure, in the scope of: 1) replacement of lighting fixtures, booms and installation of compensators for cabinets SON in the Municipality of Celestynów 2) replacement of worn-out sodium and mercury lighting fixtures with LED luminaires with additional power reduction at night. 1659 luminaires from 1916 existing 3) installation of luminaires using programmable power reducers 4) installation of a power reduction system 5) installation of reactive power compensators 6) replacement / change of 86 pcs were qualified for modernization. lighting cabinets, in accordance with the technical conditions obtained by the Contractor issued by PGE Dystrybucja S.A., 7) replacement of existing power supply elements and protections – luminaire power cords, fuse boxes, fuses; 8) removal of collisions with devices with power grids submitted to PGE Dystrybucja Oddz. Warsaw region Mińsk Mazowiecki 9) replacement of about 277 booms on poles of overhead lines (including +/- 10%). Replacement of existing supporting structures – booms in the case of fixing lamps under the line, or in the case of wrong angles of inclination, fastening, hooks 10) switching the power supply of lighting points from the Municipal Office building to the circuit with SO 0895, i.e., should be carried out taking into account the existing stylized poles, or equivalent (meeting visual and lighting aspects) to unify park lighting, existing poles are specified in the annex to the procedure 11) suspensions insulated line ASxSN 2x25 – about 45302 m (including +/- 10%) 12) Removal of the lighting control point from the Tr station Tr. In two cases specified in the PFU 13 program) preparation of design documentation for the replacement / change of street lighting control boxes, including their location and parameters, in accordance with the technical conditions obtained by the Contractor issued by PGE Dystrybucja S.A. 14) obtaining administrative decisions necessary for the implementation of construction works (The Ordering Party shall submit to the proceedings the technical conditions for the modernization of street lighting obtained from PGE Dystrybucja S.A. of 29/06/2020) 15) notification of the intention to carry out works to the District Inspector of Construction Supervision - applies to works performed on the basis of the obtained administrative decision allowing the implementation of construction works in accordance with the Construction Law Act (Journal of Laws of 2020, item 1333) 16) execution of as-built documentation of the construction works performed 17) conducting the required tests and tests, obtaining acceptance of works and preparing documents related to the commissioning of built facilities 2. The subject of the contract has been described in detail in the Functional and Utility Program, which is Annex 13 to the SWZ.