Lot 07 drywall
Dry construction work is to be carried out by the contractor:
- Plasterboard stud walls, double-clad:
—— approx. 3 050 m
—— approx. 100 m
—— approx. 45 m
—— approx. 720 m
- approx. 385 m of casings made of plasterboard 30/70 or 70/70 cm, 2-, 3-, four-sided,
- approx. 1 420 m
- approx. 450 m corner formations,
- Wall and ceiling connections:
- approx. 800 m solid wall connection,
- approx. 550 m elastic wall connection,
—— approx. 250 m solid ceiling connection,
—— approx. 680 elastic ceiling connection,
—— approx. 700 sliding ceiling connection
- 209 door openings,
- approx. 160 m universal traverse,
- approx. 174 double UA reinforcement on sanitary objects,
- approx. 50 m edge protection profile,
- close approx. 355 ceiling openings,
- Create approx. 1,640 recesses in the drywall,
- Insulation in the stairwell.