Sectoral planning ELT according to HOAI 2021 § 55 Part 4, Section 2 Service phase 1-9
Specialist planning ELT Maximiliansplatz 3, Hauptwachstr. 1, 3, 7 and 9The project "Quartier am Neuen Rathaus" consists of the
closed building ensemble between Maxplatz and
Front trench.
The quarter is a cityscape-defining
Ensemble along the Baroque axis in the center of the
UNESCO World Heritage Site, which is a UNESCO World Heritage Site.
Ensemble protection as well as in parts the individual monument protection
subordinates.
The buildings concerned are essentially classified as
Administrative location of the city administration. In the
Parts of the building along Hauptwachstraße are in the
Ground floor housed commercial units.
The aim of the general renovation is to repair the
Building envelope and building statics, including energy
Improvements, the repair of the room shells, the
Modernization of the sanitary facilities as well as the new installation
building technology, including digital media, and
state-of-the-art building management system. In addition, the buildings are on
check fire safety requirements and ensure accessibility,
as far as possible. The uses are intended to:
be retained as far as possible, the inner courtyards require
an upgrade and redesign. The existing
Spatial concept of the administrative unit Maxplatz is with regard to
of citizen-friendliness and, if necessary, to optimize it.
The ensemble is located in the heart of the Bamberg region
Downtown. Particular attention is paid to construction logistics and
Public relations. Also, it is necessary to use the
Use of the commercial units for as short a time as possible
and maintain operations.
In addition, the restructuring of the administrative unit should be carried out as far as possible
in sections, if necessary while maintaining the
administrative operation.
The measure is a high-level
Funding project. A special requirement for the project is
the reference to the silver certificate according to BNB
(Sustainable Building Rating System). For this purpose, the
Two of the following objectives have been defined as a measure of success:
1. Risks to the local environment:
The use of construction products which, due to their
pollutant levels pose a potential risk to the environment, and
health, should already be in the planning phase
can be reduced or avoided. In order to reduce the risks for the local
Keeping the environment as low as possible is a careful selection
low-pollutant and low-emission building products.
The following quality levels are sought:
- for newly introduced materials, quality level 5
- for existing materials, quality level 4
A comprehensive investigation of contaminated sites has already been carried out.
Made.
2. Sustainable material extraction/biodiversity:
For this criterion, at least quality level 3 should be achieved
become. For this purpose, at least 80% of the wood used,
Wood products and/or wood-based materials, the proof of
Use of wood products from sustainable sources
Forestry. this is done by submitting a
recognized certificate and the associated CoC certificate
proven.
Note: Parts of the façade of the property Maxplatz 3 are
already partially renovated. Here, a repair of the
Natural stone components and façade plasters as well as a window replacement
or a restoration repair. The quality is
to be continued accordingly.
Time schedule:
2022/23: Preliminary investigations and first work phases,
Invitation to tender for specialist planners
2024/2025: Work planning and tendering
2025-2028: Construction period
2029: Final invoices and proof of use
At the same time as the present call for proposals, it is intended that the
Specialist planning of the technical building equipment as well as
to put the structural design out to tender so that a timely
Project start can be guaranteed.
The following documents are already available:
1. Planunterlangen
a. Map M 1:1000
b. General plan
c. Deformation-appropriate building measurement (floor plans,
Views, sections)
d. Spartenpläne
2. Fundamentals of the building and target requirements of the
Renovation
a. Explanatory report
b. Description of the building (from the funding sketch)
c. Presentation on the condition of the building and the
Planungszielen
d. Target agreement table according to BNB
3. Preliminary investigations
a. Tragwerksgutachten
b. Bauforschungsunterlagen
c. Schadstoffgutachten
Further preliminary investigations have already been commissioned and will be carried out.
expected to be available by the end of the year. These
Include:
d. Tragwerksgutachten (Hauptwachstraße 7, 9)
e. Building Research (Hauptwachstraße 7, 9)
f. Inventories of fire protection (all buildings)
g. Building physics report (all buildings)
h. Species protection (all buildings)
Fachplanung ELT Hauptwachstr. 16The project "Quartier am Neuen Rathaus" consists of the
closed building ensemble between Maxplatz and
Vorderer Graben and the solitary building of the former
Hauptwache (Hauptwache 16).
The quarter is a cityscape-defining
Ensemble along the Baroque axis in the center of the
UNESCO World Heritage Site, which is a UNESCO World Heritage Site.
Ensemble protection as well as in parts the individual monument protection
subordinates.
The building at Hauptwachstraße 16 is located independently of the other buildings on Hauptwachstraße opposite the ensemble and, together with it, forms the entrance to the baroque axis of the old town. It is the former main station and is a three-sided free-standing, two-storey, late Baroque sandstone ashlar building built in 1774 with a hipped mansard roof on one side and a central risalit with a triangular gable.
The buildings concerned are essentially classified as
Administrative location of the city administration. In the
Parts of the building along Hauptwachstraße are in the
Ground floor housed commercial units.
The aim of the general renovation is to repair the
Building envelope and building statics, including energy
Improvements, the repair of the room shells, the
Modernization of the sanitary facilities as well as the new installation
building technology, including digital media, and
state-of-the-art building management system. In addition, the buildings are on
check fire safety requirements and ensure accessibility,
as far as possible. The uses are intended to:
be retained as far as possible, the inner courtyards require
an upgrade and redesign. The existing
Spatial concept of the administrative unit Maxplatz is with regard to
of citizen-friendliness and, if necessary, to optimize it.
The ensemble is located in the heart of the Bamberg region
Downtown. Particular attention is paid to construction logistics and
Public relations. Also, it is necessary to use the
Use of the commercial units for as short a time as possible
and maintain operations.
In addition, the restructuring of the administrative unit should be carried out as far as possible
in sections, if necessary while maintaining the
administrative operation.
The measure is a high-level
Funding project. A special requirement for the project is
the reference to the silver certificate according to BNB
(Sustainable Building Rating System). For this purpose, the
Two of the following objectives have been defined as a measure of success:
1. Risks to the local environment:
The use of construction products which, due to their
pollutant levels pose a potential risk to the environment, and
health, should already be in the planning phase
can be reduced or avoided. In order to reduce the risks for the local
Keeping the environment as low as possible is a careful selection
low-pollutant and low-emission building products.
The following quality levels are sought:
- for newly introduced materials, quality level 5
- for existing materials, quality level 4
A comprehensive investigation of contaminated sites has already been carried out.
Made.
2. Sustainable material extraction/biodiversity:
For this criterion, at least quality level 3 should be achieved
become. For this purpose, at least 80% of the wood used,
Wood products and/or wood-based materials, the proof of
Use of wood products from sustainable sources
Forestry. this is done by submitting a
recognized certificate and the associated CoC certificate
proven.
Note: Parts of the façade of the property Maxplatz 3 are
already partially renovated. Here, a repair of the
Natural stone components and façade plasters as well as a window replacement
or a restoration repair. The quality is
to be continued accordingly.
Time schedule:
2022/23: Preliminary investigations and first work phases,
Invitation to tender for specialist planners
2024/2025: Work planning and tendering
2025-2028: Construction period
2029: Final invoices and proof of use
At the same time as the present call for proposals, it is intended that the
Specialist planning of the technical building equipment as well as
to put the structural design out to tender so that a timely
Project start can be guaranteed.
The following documents are already available:
1. Planunterlangen
a. Map M 1:1000
b. General plan
c. Deformation-appropriate building measurement (floor plans,
Views, sections)
d. Spartenpläne
2. Fundamentals of the building and target requirements of the
Renovation
a. Explanatory report
b. Description of the building (from the funding sketch)
c. Presentation on the condition of the building and the
Planungszielen
d. Target agreement table according to BNB