Erection of various metal structures such as railings, ramps, steel stairs, steel ramps, bicycle racks, trellis, grating covers, grid partitions, substructures, etc.
Creation of work and assembly plans
— approx. 33 m all-glass railing roof terraces,
— ca. 191 m stair railing,
— approx. 8.8 m steel substructure for parapets for on-site clothing,
— approx. 21 m railing for on-site clothing,
— approx. 190 m wall handrail,
— approx. 19.5 m
— approx. 2.8 tonnes support structure made of hot-dip galvanised steel profiles for grating cover on smoke extraction shafts,
— approx. 42 m
— 1 steel ramp L approx. 9 m, W approx. 2.1 m to accommodate the on-site dry screed,
— 2 ladders,
— 1 steel staircase with 2 gradients,
— 3 pieces of grid partitions,
— 4 bike racks for a total of about 27 bikes,
— approx. 14 m
— ca. 26 m
— approx. 14 m bump protection for wheelie bin parking,
— 2 pieces of letterbox systems,
— 1 video door station,
— 1 piece of tensil system,
— approx. 33 m steel substructure for furniture (reception counters and the like).