Expansion of the bridge across the river Gwda within the State Route 11 in the mouth.
Characteristic parameters
Basic technical parameters of the demolition facility:
- debt. total: ~79,75 m;
- theoretical section of spans: 19,50+27,00+19,50 [m];
- horizontal light (central span): ~25.46 m;
- width total: ~10,00 m;
- width of the road: ~7.00 m;
- intersection angle with obstacle: ~90°;
- load:C according to PN-85/S-10030;
- construction year:1953-1954
Par. zaproj. Object
- foundation: indirect;
- vertical lights:4.22 m to the elevation of the maximum water table 0,3% for the proj.bridge;
- horizontal lights:64.50 m;
- long. total object:86,70 m;
- long. total span: 67,90 m;
- theoretical span: 65,90 m;
- elevation of the beginning of the bridge: 55.42 m above sea level;
- elevation of the end of the bridge: 55,47 m above sea level;
- intersection angle with obstacle: ~90°;
- width of the roadway: 2x4,00=8,00 m;
- sidewalk:1.50 m;
- hiking-bike-traverse width:3.50 m;
- kl.obciążenia:A wg PN-S/85/10030+STANAG 150
The task of its scope includes, among others, the construction of a new bridge in place of the existing one located in kilometre 190+859 of the national road Noteć river in Ujście (Pilskie County, Greater Poland Voivodeship).
The investment envisages the demolition of the existing facility and the construction of a new structure in its place when carrying out traffic by a travelling bridge.
As a result of the expansion, the facility will gain a higher load capacity class and improve the performance of the crossing, among others, thanks to its expansion with walking and bicycle. Equipment elements of the new structure, in particular road safety barriers, will improve safety and improve the comfort of users.