The new building of the Germersheim fire brigade is an elongated, compact cube on the outside, which houses the various uses. Building key data: External dimensions:
— approx. 95 m x 30 m x 7.6 m,
— Usable area: 2 472.10 m2,
— GFA: 3 643.30 m2,
— BRI: 19 470 m³.
Vehicle hall and warehouse as well as the foyer in the north-east extend over the entire height of the building, the areas with operations center, breathing protection area and clothing care, technology, social and training rooms are arranged in an L-shape on 2 levels.
With the exception of the steel columns in the foyer, the load-bearing structure is made of reinforced concrete (walls, columns, ceilings). Columns or walls are arranged along the longitudinal facades and in the middle of the building in a grid of 4.5 m. Semi-prefabricated beams are placed on the supports in the transverse direction of the building. Between the beams planned at intervals of approx. 4.5 m, a flat ceiling made of single-axis exciting semi-precast ceiling panels with top-side in-situ concrete addition spans.
Lot 28 - Road and civil engineering work.
- 5,400 sqm asphalt surfaces
- 900 square meters of concrete paving
- 550 running meters of curbs
- 3,000 cbm earthwork
- 1,000 running meters trenches
- 170 running meters of drainage channels
- 20 m rod mesh fence
- 8 prefabricated benches with seat cushions