Execution of complete heat supply systems in the new building of the 4-storey functional wing and in the conversion areas of the existing buildings.
Main measures of the services to be provided for the heat supply systems:
new building:
- approx. 172 St. heating surfaces,
- approx. 2 500 m steel pipes for heating water (welding and pressing),
- 1 St. heating distributor,
- approx. 100 pieces of fittings for heating water.
Modification:
- approx. 4 St. heating surfaces,
- approx. 200 m steel pipes for heating water (welding and pressing).