The construction project involves a station renovation including fire protection upgrading of the entire level. The affected building is a reinforced concrete skeleton structure. The supporting structure consists of concrete columns, the ceilings are tensioned with beams on the load-bearing components. The interior consists mainly of plasterboard walls, partly shafts were bricked for fire protection reasons. In the run-up to the measure, a pollutant remediation was carried out on the entire level, and all components contaminated for the execution of the work were removed by a specialist company.
The construction measures to be carried out are carried out under the strictest hygiene regulations and require increased requirements for dust protection measures.
Carpentry
For more details, please refer to the attached bill of quantities.
See above and see tender documents