Description:
Offshore platform installation (OSY) for the MOG project.

Installation of the Offshore SwitchYard (OSY) Platform for the Modular Offshore Grid (MOG) project including but not limited to: installation, engineering, providing cargobarge, transport to the offshore location and demobilization of installation spread. Main case: installation of jacket and piles by the end of 2018, installation of topside in first half of 2019.

The final contracting entity may be:

(i) Elia Asset S.A. and/or Elia System Operator S.A.; and/or

(ii) Any company belonging to the Elia group; and/or

(iii) A new company that will be set up by one of the companies of the Elia Group.

More information will be given in the call for tender.



Scope of work for the Offshore Installation Contractor:

— Installation engineering (e.g. rigging, mooring, barge tow ballast, anchor positions, etc.);

— Check Detailed Design of the permanent structure interfaces with the installation works (e.g. pad-eyes, upper grillage, clearances, noise mitigation provisions, etc.);

— Grillage and sea-fastening design (all structures);

— Obtain (engineering) approval for sail and installation from Marine Warranty Surveyor (prior sail);

— Provide cargobarge for sea-transport at fabrication yard (hand-over / pick-up at fabrication yard);

— Provide rigging at fabrication yard;

— Inspection of all installed installation aids prior sail (grillages, seafastening, guides / bumpers, rigging frames, etc.);

— Transport of project to offshore location (by tugs, towing cargobarge);

— Mobilization installation spread at offshore location (on anchors or DP);

— Perform seabed survey at offshore location prior installation of project (confirm level of seabed);

— Install pre-designed noise mitigation equipment prior pile driving;

— Install, level and weld the project packages (battered jacket max weight 1 500 ton, piles max length 100 m, topside max weight 2 000 ton);

— Remove temporary installation provisions on project (rigging frames, guides / bumpers, temporary lift braces);

— Re-install project specific items that can't be done after demobilization installation spread (helideck hatches, fall protection, ladder parts, etc.);

— Remove any debris on the platform, repair of damages caused by the Offshore Installation Contractor to permanent structures;

— Perform final seabed survey, check for any debris at seabed (and removal);

— Demobilization installation spread;

— Cleaning of cargo barge;

— As-installed engineering package.

Download full details as .pdf
The Buyer:
Elia Asset N.V.
CPV Code(s):
34514800 - Offshore platforms
76520000 - Offshore services
76521000 - Offshore installation services
76522000 - Offshore supply-vessel services